For our technical direction class, Problems in Tech Theatre, we each selected a rigging scenario and compiled a presentation that covered all the hardware required and the math we did to reach that conclusion. Included in the presentation packet are drawings of the scanrio, presentation slides, and manufacturer specifications on products used in the rig.
We were given a multistory set design and budget, and the assignment was to figure out how to build the theoretical design and budget out the materials and labor. This included details we would not typically encounter in an academic technical direction project such as lack of stock, overhire carpenters, rental of trucks, etc.